History, Environmental and Political Management Of Ronald Regan Washington National Airport
Title: History, Environmental and Political Management Of Ronald Regan Washington National Airport
Category: /Business & Economy
Details: Words: 2052 | Pages: 7 (approximately 235 words/page)
History, Environmental and Political Management Of Ronald Regan Washington National Airport
Category: /Business & Economy
Details: Words: 2052 | Pages: 7 (approximately 235 words/page)
Abstract This report provides an overview of the Ronald Regan Washington National Airport's past and future problems with construction design, environmental concerns and political troubles. Section I of the report provides an introduction to the airport and its history of construction. Section II talks about the main terminal design and the concerns it raised along with the first legal troubles. Section III presents overview of expansion of the National Airport. Section IV describes the efforts
showed first 75 words of 2052 total
You are viewing only a small portion of the paper.
Please login or register to access the full copy.
Please login or register to access the full copy.
showed last 75 words of 2052 total
the troubles and problems it has seen the future now seems to be improving for the airport made on the mudflats of the Potomac.
References AirNav (2003) http://www.airnav.com/airport/DCA Airport Technology (2003) http://www.airport-technology.com/projects/ronaldreagan/ Airwise (2003) http://www.airwise.com/airports/us/DCA/DCA_07.html Fly Virginia (2003) http://www.flyvirginia.com/airport/DCA/ MWAA (2003) http://www.mwaa.com/national/history.htm Figures Figure 1. Source: Fly Virginia 2003 Figure 2. Source: Airport Technology (2003)